Best value and service in finishing for all our customers

Case study: National Assembly of Wales

  • National Assembly of Wales National Assembly of Wales

The National Assembly of Wales is located on the waterfront area which faces the waters of Cardiff Bay. The building has three levels, two of which are open to the public. Constructed directly over the Debating Chamber on the lower level, is an impressive twelve metre high circular funnel. The funnel is clad on the outside with cedar panels and internally with 90mm diameter aluminium tubes, which are arranged horizontally to follow the profile of this structure.

LBL Finishers were commissioned to finish the tubes in Macrosheen™, which was specified due to being a direct alternative to anodising with the added creativity of a pearlescent finish.


Back to Case Studies List

Project Details

Case study: National Assembly of Wales

Location: Cardiff, Wales

Finish: Macrosheen MS7 Natural

Size: 2,000 Linear Metres


Finisher: LBL Finishers

Client: Barrett Ceilings
View Client Website

Paint Manufacturer: Valspar
View Manufacturer Website

"Best value and service in finishing for all our customers"

Tomburn European Offices

  • LBL Finishers (LBL Finishers)
    +44 2392 692 020 | +44 2392 670 379 | Email Us

  • Tomburn CZ s.r.o (Tomburn CZ)
    +420 517 070 841 | +420 516 412 170 | Email Us